Singapore TEL T301
PeriodMay '16 - Jan '24 NationSingapore ClientGS E&C - LTA ProjectContract T301-Construction of 4-in-1 rail and bus depot and reception tunnels for Thomson-East Coast Line FieldIntegrated Depot StageConstruction Work ScopeBIM & Virtual Construction -
Donghae Harbor
BIM ProjectPeriodNov '15 - Mar '16 NationKorea ClientKorea Port Engineering Corporation ProjectDonghae Harbor Step 3 North Jetty (Lot No.1) Masonry Alternative design service FieldHarbor StageTender Work ScopeBIM -
Namhae 2nd Bridge
BIM/Virtual ConstructionPeriodDec '15 - Apr '16 NationKorea ClientGS E&C ProjectNamhae 2nd Bridge BIM and virtual construction system building(pylons and cabling) FieldBridge StageConstruction Work ScopeBIM & Virtual Construction -
Singapore TEL Project
BIM/Virtual ConstructionPeriodApr '15 - Dec '15 NationSingapore ClientGS E&C, SK E&C ProjectSingapore Thomson East Coast Line Tender FieldSubway StageTender Work ScopeBIM & Virtual Construction -
Haenam-Yeongam tourism & leisure-type business city
BIM/Virtual ConstructionPeriodFeb '15 - Mar '15 NationKorea ClientPyunghwa Engineering Consultants ProjectHaenam-Yeongam tourism&leisure-type business city construction, access road construction Lot No.1 basic design services FieldBridge StageBasic Design Work ScopeBIM & Virtual Construction -
Production of Promotion Video for Infra BIM
An introduction video has been produced for promotion of BIM in infrastructure domain. The main contents in the video as follows: - Introduction...Period NationSouth Korea ClientKICT ProjectProduction of Promotion Video for Infra BIM Field Stage Work Scope -
Construction management system considering the site cond...
For the development of offshore wind power generation system of the monopile type, to build a 3d virtual evaluation system based on BIM, we exa...Period NationSouth Korea ClientKICT/POSCO E&C ProjectConstruction management system considering the site conditions using BIM , Offshore Wind force's Monopile, II Field Stage Work Scope -
BIM & Shop Drawing, Qatar Integrated Railway Project Doh...
One of the 5 design-and-Build Project including 2 complex stations for Doha Metro underground structures in Qatar. The main aims are verificat...Period NationQatar ClientSOQ JV (Samsung C&T - OHL - QBC JV) ProjectBIM & Shop Drawing, Qatar Integrated Railway Project Doha Metro : Major Stations Field Stage Work Scope -
BIM & Virtual Construction, Seoul metropolitan Area’s Ra...
Taesung S&I made a BIM based design from existing 2D based design and As-built BIM model of temporary works from 3D Laser Scanning data. Also...Period NationSouth Korea ClientGS E&C ProjectBIM & Virtual Construction, Seoul metropolitan Area’s Rapid Transit Railway(Suseo~Pyeongtaek) Lot No. 9 Field Stage Work Scope -
Development of 3D BIM Library for Free-from Roof System,...
POSCO developed a new product, connection ball in truss structure, for supporting free-from roof system. This project has been conducted f...Period NationSouth Korea ClientPOSCO E&C ProjectDevelopment of 3D BIM Library for Free-from Roof System, and Construction Simulation Field Stage Work Scope -
Development of prototype viewer and converter for valida...
This project has been performed for validation of a new IFC schema developed by KICT which is a government funded institute. Taesung S...Period NationSouth Korea ClientKorea Institute of Civil Engineering and Building Technology (KICT) ProjectDevelopment of prototype viewer and converter for validation of Infra-IFC schema Field Stage Work Scope -
Development of a prototype of cost estimation system for...
Taesung S&I has developed a prototype system for supporting cost estimation for radio-activated concrete structure in a nuclear power plant...Period NationSouth Korea ClientGS E&C ProjectDevelopment of a prototype of cost estimation system for decommissioning of radio-activated concrete in nuclear power plant Field Stage Work Scope -
Development of a ICT Convergence Inspection System for N...
This project is a government funded R&D project, and four organizations are participating in. Core concept is capturing images of damages ...Period NationSouth Korea ClientKorea Institute of Energy Technology Evaluation and Planning (KETEP) ProjectDevelopment of a ICT Convergence Inspection System for Nuclear Power Plant Field Stage Work Scope -
Planning for adoption of Infra-BIM and Establishment of ...
Taesung S&I provided a consultation service for establishment of an Infra-BIM adoption roadmap in the enterprise level. In the research, a ...Period NationSouth Korea ClientGS E&C ProjectPlanning for adoption of Infra-BIM and Establishment of Roadmap Field Stage Work Scope -
BIM, DESIGN & CONSTRUCTION OF CP07-B LUSAIL TOWERS INFRA...
BIM’s information model of Structure and Infra structure are made of existing 2D based drawings. Also, 3D model objects were linked with processe...Period NationQatar ClientSAMSUNG C&T - Qatar Building Company JV ProjectBIM, DESIGN & CONSTRUCTION OF CP07-B LUSAIL TOWERS INFRASTRUCTURE, LRT STATION, CAR PARK AND LANDSCAPE (Tender) Field Stage Work Scope -
BIM & Virtual Construction , shiniwamatsu electric power...
BIM’s information model of Electric power plant is made of existing 2D based drawings. Also, 3D model objects were linked with processes linkage....Period NationJapan ClientMAEDA E&C ProjectBIM & Virtual Construction , shiniwamatsu electric power plant Field Stage Work Scope -
BIM & Virtual Construction, Test Track Construction
Taesung S&I made a BIM based design from existing 2D based design. Then we checked the optimum equipment capacity to install the elements...Period NationSouth Korea ClientDAELIM ProjectBIM & Virtual Construction, Test Track Construction Field Stage Work Scope -
BIM & Virtual Construction, Songdo International Busines...
BIM’s information model of Songdo 4th Bridge in Lot No. 5-7 is made of existing 2D based drawings. Also, 3D model objects were linked with proc...Period NationSouth Korea ClientGS E&C ProjectBIM & Virtual Construction, Songdo International Business District Access road Lot No. 5-7 Field Stage Work Scope -
Virtual Construction, Joongang' railway (Dodam - Yeongch...
Taesung S&I made a BIM based design from existing 2D based design. Then we checked the optimum equipment capacity to install the elements of...Period NationSouth Korea ClientDAELIM ProjectVirtual Construction, Joongang' railway (Dodam - Yeongcheon) Double Track Railway Lot No. 6 Field Stage Work Scope -
T/K, Incheon passenger terminal 2nd
BIM’s information model of Passenger Terminal 2nd made from existing 2D based drawings. Also, 3D model objects were linked with processes l...Period NationKorea ClientSamsung C&T ProjectT/K, Incheon passenger terminal 2nd Field Stage Work Scope