1. Donghae Harbor

    BIM Project
    PeriodNov '15 - Mar '16 NationKorea ClientKorea Port Engineering Corporation ProjectDonghae Harbor Step 3 North Jetty (Lot No.1) Masonry Alternative design service FieldHarbor StageTender Work ScopeBIM
    Read More
  2. Namhae 2nd Bridge

    BIM/Virtual Construction
    PeriodDec '15 - Apr '16 NationKorea ClientGS E&C ProjectNamhae 2nd Bridge BIM and virtual construction system building(pylons and cabling) FieldBridge StageConstruction Work ScopeBIM & Virtual Construction
    Read More
  3. Singapore TEL Project

    BIM/Virtual Construction
    PeriodApr '15 - Dec '15 NationSingapore ClientGS E&C, SK E&C ProjectSingapore Thomson East Coast Line Tender FieldSubway StageTender Work ScopeBIM & Virtual Construction
    Read More
  4. Haenam-Yeongam tourism & leisure-type business city

    BIM/Virtual Construction
    PeriodFeb '15 - Mar '15 NationKorea ClientPyunghwa Engineering Consultants ProjectHaenam-Yeongam tourism&leisure-type business city construction, access road construction Lot No.1 basic design services FieldBridge StageBasic Design Work ScopeBIM & Virtual Construction
    Read More
  5. Production of Promotion Video for Infra BIM

    An introduction video has been produced for promotion of BIM in infrastructure domain. The main contents in the video as follows: - Introduction...
    Period NationSouth Korea ClientKICT ProjectProduction of Promotion Video for Infra BIM Field Stage Work Scope
    Read More
  6. Construction management system considering the site cond...

    For the development of offshore wind power generation system of the monopile type, to build a 3d virtual evaluation system based on BIM, we exa...
    Period NationSouth Korea ClientKICT/POSCO E&C ProjectConstruction management system considering the site conditions using BIM , Offshore Wind force's Monopile, II Field Stage Work Scope
    Read More
  7. BIM & Shop Drawing, Qatar Integrated Railway Project Doh...

    One of the 5 design-and-Build Project including 2 complex stations for Doha Metro underground structures in Qatar. The main aims are verificat...
    Period NationQatar ClientSOQ JV (Samsung C&T - OHL - QBC JV) ProjectBIM & Shop Drawing, Qatar Integrated Railway Project Doha Metro : Major Stations Field Stage Work Scope
    Read More
  8. BIM & Virtual Construction, Seoul metropolitan Area’s Ra...

    Taesung S&I made a BIM based design from existing 2D based design and As-built BIM model of temporary works from 3D Laser Scanning data. Also...
    Period NationSouth Korea ClientGS E&C ProjectBIM & Virtual Construction, Seoul metropolitan Area’s Rapid Transit Railway(Suseo~Pyeongtaek) Lot No. 9 Field Stage Work Scope
    Read More
  9. Development of 3D BIM Library for Free-from Roof System,...

    POSCO developed a new product, connection ball in truss structure, for supporting free-from roof system. This project has been conducted f...
    Period NationSouth Korea ClientPOSCO E&C ProjectDevelopment of 3D BIM Library for Free-from Roof System, and Construction Simulation Field Stage Work Scope
    Read More
  10. Development of prototype viewer and converter for valida...

    This project has been performed for validation of a new IFC schema developed by KICT which is a government funded institute. Taesung S...
    Period NationSouth Korea ClientKorea Institute of Civil Engineering and Building Technology (KICT) ProjectDevelopment of prototype viewer and converter for validation of Infra-IFC schema Field Stage Work Scope
    Read More
  11. Development of a prototype of cost estimation system for...

    Taesung S&I has developed a prototype system for supporting cost estimation for radio-activated concrete structure in a nuclear power plant...
    Period NationSouth Korea ClientGS E&C ProjectDevelopment of a prototype of cost estimation system for decommissioning of radio-activated concrete in nuclear power plant Field Stage Work Scope
    Read More
  12. Development of a ICT Convergence Inspection System for N...

    This project is a government funded R&D project, and four organizations are participating in. Core concept is capturing images of damages ...
    Period NationSouth Korea ClientKorea Institute of Energy Technology Evaluation and Planning (KETEP) ProjectDevelopment of a ICT Convergence Inspection System for Nuclear Power Plant Field Stage Work Scope
    Read More
  13. Planning for adoption of Infra-BIM and Establishment of ...

    Taesung S&I provided a consultation service for establishment of an Infra-BIM adoption roadmap in the enterprise level. In the research, a ...
    Period NationSouth Korea ClientGS E&C ProjectPlanning for adoption of Infra-BIM and Establishment of Roadmap Field Stage Work Scope
    Read More
  14. BIM, DESIGN & CONSTRUCTION OF CP07-B LUSAIL TOWERS INFRA...

    BIM’s information model of Structure and Infra structure are made of existing 2D based drawings. Also, 3D model objects were linked with processe...
    Period NationQatar ClientSAMSUNG C&T - Qatar Building Company JV ProjectBIM, DESIGN & CONSTRUCTION OF CP07-B LUSAIL TOWERS INFRASTRUCTURE, LRT STATION, CAR PARK AND LANDSCAPE (Tender) Field Stage Work Scope
    Read More
  15. BIM & Virtual Construction , shiniwamatsu electric power...

    BIM’s information model of Electric power plant is made of existing 2D based drawings. Also, 3D model objects were linked with processes linkage....
    Period NationJapan ClientMAEDA E&C ProjectBIM & Virtual Construction , shiniwamatsu electric power plant Field Stage Work Scope
    Read More
  16. BIM & Virtual Construction, Test Track Construction

    Taesung S&I made a BIM based design from existing 2D based design. Then we checked the optimum equipment capacity to install the elements...
    Period NationSouth Korea ClientDAELIM ProjectBIM & Virtual Construction, Test Track Construction Field Stage Work Scope
    Read More
  17. BIM & Virtual Construction, Songdo International Busines...

    BIM’s information model of Songdo 4th Bridge in Lot No. 5-7 is made of existing 2D based drawings. Also, 3D model objects were linked with proc...
    Period NationSouth Korea ClientGS E&C ProjectBIM & Virtual Construction, Songdo International Business District Access road Lot No. 5-7 Field Stage Work Scope
    Read More
  18. Virtual Construction, Joongang' railway (Dodam - Yeongch...

    Taesung S&I made a BIM based design from existing 2D based design. Then we checked the optimum equipment capacity to install the elements of...
    Period NationSouth Korea ClientDAELIM ProjectVirtual Construction, Joongang' railway (Dodam - Yeongcheon) Double Track Railway Lot No. 6 Field Stage Work Scope
    Read More
  19. T/K, Incheon passenger terminal 2nd

    BIM’s information model of Passenger Terminal 2nd made from existing 2D based drawings. Also, 3D model objects were linked with processes l...
    Period NationKorea ClientSamsung C&T ProjectT/K, Incheon passenger terminal 2nd Field Stage Work Scope
    Read More
  20. Honam High-speed Railway depot

    BIM’s information model of Arch Bridge made from existing 2D based drawings. Also, 3D model objects were linked with processes linkage. T...
    Period NationKorea ClientDaelim ProjectHonam High-speed Railway depot Field Stage Work Scope
    Read More
Board Pagination ‹ Prev 1 2 3 Next ›
/ 3

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 Cancel

Designed by sketchbooks.co.kr / sketchbook5 board skin

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5