1. Pontoon simulation, Building BIM, Rowing race stadium ta...

    Taesung S&I made an equipment simulation. We constructed 3d integrated construction management system based on BIM in order to examine ...
    Period NationKorea ClientSsangyong E&C ProjectPontoon simulation, Building BIM, Rowing race stadium tangeum lake Chungju Field Stage Work Scope
    Read More
  2. BIM, Small Boat Harbor Project

    Taesung S&I made a BIM based design from existing 2D based design. Then reviewed the safety measures for installation of the elements...
    Period NationKuwait ClientDaelim ProjectBIM, Small Boat Harbor Project Field Stage Work Scope
    Read More
  3. BIM, Small Boat Harbor Project

    Kuwait harbor construction project bid was supported. Existing port facilities maintenance extended to design and construction was schedule...
    Period NationKuwait ClientDaelim ProjectBIM, Small Boat Harbor Project Field Stage Work Scope
    Read More
  4. 3D BIM simulation, Construction of Honam High-speed Rail...

    BIM’s information model of Railway made from existing 2D based drawings. Also, 3D model objects were linked with processes linkage. Adjacen...
    Period NationKorea ClientDaelim Project3D BIM simulation, Construction of Honam High-speed Railway 3-3 Field Stage Work Scope
    Read More
  5. BIM design, Construction of railways connecting, Incheon...

    BIM’s information model of box-type structure made from existing 2D based drawings. Also, crash detection was applied about 3D model object...
    Period NationKorea ClientDaelim ProjectBIM design, Construction of railways connecting, Incheon International Airport Terminal 2 Field Stage Work Scope
    Read More
  6. Making a trial product, BIM based road project's design ...

    The KICT, a national research institute in Korea has commissioned to test commercial BIM tools for road project. This project aimed to: Ide...
    Period NationKorea ClientKorea Institute of Construction Technology(KICT) ProjectMaking a trial product, BIM based road project's design books Field Stage Work Scope
    Read More
  7. Steel reinforcement DMU(Digital Mock-Up) & Shop drawing

    Project is construction of Honam-speed Railway 3-1, Korea. Upper girder of bridge all PSC BOX type(30/35/40M PSC BOX, 40M FSM PSC BOX) in D...
    Period NationKorea ClientDongbu E&C ProjectSteel reinforcement DMU(Digital Mock-Up) & Shop drawing Field Stage Work Scope
    Read More
  8. Support proposal for building equally nervous system Tes...

    BIM’s information model was applied to the Cable-Stayed bridge. Taesung S&I made a BIM based design from existing 2D based design. The pur...
    Period NationKorea ClientPosco E&C ProjectSupport proposal for building equally nervous system Test Bed Field Stage Work Scope
    Read More
  9. 3D Fabrication Model & Shop Drawing, Samcheok Breakwater

    This project of the Dongbu E&C 1800m breakwater is construction site. 72 typical types of caisson were 3d reinforced modeling: Com...
    Period NationKorea ClientDongbu E&C Project3D Fabrication Model & Shop Drawing, Samcheok Breakwater Field Stage Work Scope
    Read More
  10. Virtual Construction, Lusail Expressway

    Taesung S&I made an equipment simulation. In order to examine the safety and workability associated with the operation of the crane app...
    Period NationQatar ClientDongbang ProjectVirtual Construction, Lusail Expressway Field Stage Work Scope
    Read More
  11. BIM, KL MRT Station (Tender)

    BIM’s information model was applied to three Railway Stations of KL MRT Station in Kuala Lumpur. Taesung S&I made a BIM based design ...
    Period NationMalaysia ClientBCMP ProjectBIM, KL MRT Station (Tender) Field Stage Work Scope
    Read More
  12. BIM, Sihwa Multi Techno Valley Lot No. 3

    Housing complex development project. Roads, terrain, soil, underground pipeline, manhole, etc. all things 3D modeling of complex conf...
    Period NationKorea ClientDaelim ProjectBIM, Sihwa Multi Techno Valley Lot No. 3 Field Stage Work Scope
    Read More
  13. Virtual Construction, Nakdong River See Dike Sluice

    Taesung S&I made an equipment simulation. Considering the possible construction operation plan by building the 3d equipment operation...
    Period NationKorea ClientSamsung C&T ProjectVirtual Construction, Nakdong River See Dike Sluice Field Stage Work Scope
    Read More
  14. BIM & Virtual Construction, Honam High Speed Railway Lot...

    BIM’s information model was applied to new Railway Bridge crossing the existing railway bridge for KTX. Taesung S&I made a BIM based de...
    Period NationKorea ClientSK E&C ProjectBIM & Virtual Construction, Honam High Speed Railway Lot No. 1-1 Field Stage Work Scope
    Read More
Board Pagination ‹ Prev 1 2 3 Next ›
/ 3

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 Cancel

Designed by sketchbooks.co.kr / sketchbook5 board skin

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5