1. Development of a prototype of cost estimation system for...

    Taesung S&I has developed a prototype system for supporting cost estimation for radio-activated concrete structure in a nuclear power plant...
    Period NationSouth Korea ClientGS E&C ProjectDevelopment of a prototype of cost estimation system for decommissioning of radio-activated concrete in nuclear power plant Field Stage Work Scope
    Read More
  2. Development of a ICT Convergence Inspection System for N...

    This project is a government funded R&D project, and four organizations are participating in. Core concept is capturing images of damages ...
    Period NationSouth Korea ClientKorea Institute of Energy Technology Evaluation and Planning (KETEP) ProjectDevelopment of a ICT Convergence Inspection System for Nuclear Power Plant Field Stage Work Scope
    Read More
  3. Planning for adoption of Infra-BIM and Establishment of ...

    Taesung S&I provided a consultation service for establishment of an Infra-BIM adoption roadmap in the enterprise level. In the research, a ...
    Period NationSouth Korea ClientGS E&C ProjectPlanning for adoption of Infra-BIM and Establishment of Roadmap Field Stage Work Scope
    Read More
  4. BIM, DESIGN & CONSTRUCTION OF CP07-B LUSAIL TOWERS INFRA...

    BIM’s information model of Structure and Infra structure are made of existing 2D based drawings. Also, 3D model objects were linked with processe...
    Period NationQatar ClientSAMSUNG C&T - Qatar Building Company JV ProjectBIM, DESIGN & CONSTRUCTION OF CP07-B LUSAIL TOWERS INFRASTRUCTURE, LRT STATION, CAR PARK AND LANDSCAPE (Tender) Field Stage Work Scope
    Read More
  5. BIM & Virtual Construction , shiniwamatsu electric power...

    BIM’s information model of Electric power plant is made of existing 2D based drawings. Also, 3D model objects were linked with processes linkage....
    Period NationJapan ClientMAEDA E&C ProjectBIM & Virtual Construction , shiniwamatsu electric power plant Field Stage Work Scope
    Read More
  6. BIM & Virtual Construction, Test Track Construction

    Taesung S&I made a BIM based design from existing 2D based design. Then we checked the optimum equipment capacity to install the elements...
    Period NationSouth Korea ClientDAELIM ProjectBIM & Virtual Construction, Test Track Construction Field Stage Work Scope
    Read More
  7. BIM & Virtual Construction, Songdo International Busines...

    BIM’s information model of Songdo 4th Bridge in Lot No. 5-7 is made of existing 2D based drawings. Also, 3D model objects were linked with proc...
    Period NationSouth Korea ClientGS E&C ProjectBIM & Virtual Construction, Songdo International Business District Access road Lot No. 5-7 Field Stage Work Scope
    Read More
  8. Virtual Construction, Joongang' railway (Dodam - Yeongch...

    Taesung S&I made a BIM based design from existing 2D based design. Then we checked the optimum equipment capacity to install the elements of...
    Period NationSouth Korea ClientDAELIM ProjectVirtual Construction, Joongang' railway (Dodam - Yeongcheon) Double Track Railway Lot No. 6 Field Stage Work Scope
    Read More
  9. T/K, Incheon passenger terminal 2nd

    BIM’s information model of Passenger Terminal 2nd made from existing 2D based drawings. Also, 3D model objects were linked with processes l...
    Period NationKorea ClientSamsung C&T ProjectT/K, Incheon passenger terminal 2nd Field Stage Work Scope
    Read More
  10. Honam High-speed Railway depot

    BIM’s information model of Arch Bridge made from existing 2D based drawings. Also, 3D model objects were linked with processes linkage. T...
    Period NationKorea ClientDaelim ProjectHonam High-speed Railway depot Field Stage Work Scope
    Read More
  11. Building 3D simulation, Water treatment structure, Asan-...

    BIM’s information model of Water Treatment structure made from existing 2D based drawings. Also, 3D model objects were linked with proces...
    Period NationKorea ClientSamsung C&T ProjectBuilding 3D simulation, Water treatment structure, Asan-Tangjeong 2nd industrial complex Field Stage Work Scope
    Read More
  12. Education of civil's BIM

    Taesung S&I made a BIM education curriculum for Samsung C&T managers and employees. It is the basic and advanced application c...
    Period NationKorea ClientSamsung C&T ProjectEducation of civil's BIM Field Stage Work Scope
    Read More
  13. Making a trial product, Civil facility based BIM

    The road structure libraries was commissioned by KICT to promote BIM in civil infrastructure field. The libraries have been implemented b...
    Period NationKorea ClientKorea Institute of Construction Technology(KICT) ProjectMaking a trial product, Civil facility based BIM Field Stage Work Scope
    Read More
  14. Building BIM based reinforcement management system

    Taesung S&I made a BIM based design from existing 2D based drawings. Then DMU about typical Box-type and Abutment are performed and c...
    Period NationKorea ClientHyundai E&C ProjectBuilding BIM based reinforcement management system Field Stage Work Scope
    Read More
  15. Making a trial product,BIM based radioactive Inventory i...

    This project has been performed as a branch of national R&D project for demolition of nuclear power plant. The aim of this project ...
    Period NationKorea ClientGS E&C ProjectMaking a trial product,BIM based radioactive Inventory information's 3D visualization & calculating module amount of waste Field Stage Work Scope
    Read More
  16. 3D simulation, Closed railway of Honam High-speed Railwa...

    Honam high-speed rail section 5-3 for the construction of the adjacent line 3D virtual review system is applied to the 3D information mod...
    Period NationKorea ClientGS E&C Project3D simulation, Closed railway of Honam High-speed Railway 5-3 Field Stage Work Scope
    Read More
  17. Reinforced caissons DMU(Digital Mock-Up), Sonduong Port

    Located in Vietnam Sonduong Port of the breakwater and wharf construction site. This project is 3d reinforcement DMU, Shop-drawings, reba...
    Period NationVietnam ClientSamsung C&T ProjectReinforced caissons DMU(Digital Mock-Up), Sonduong Port Field Stage Work Scope
    Read More
  18. Building BIM, Busan subway line 1 Extension 5

    3D information model (BIM) and web-based IT technologies integrated construction management system are based on using the 4D system, safe...
    Period NationKorea ClientSsangyong E&C ProjectBuilding BIM, Busan subway line 1 Extension 5 Field Stage Work Scope
    Read More
  19. Qatar Integrated Railway Project

    Taesung S&I made a BIM based design from existing 2D based design. Then BIM based design compared with 2D based design. Also, traffic d...
    Period NationQatar ClientDOHAM KTQ-JV ProjectQatar Integrated Railway Project Field Stage Work Scope
    Read More
  20. 3D BIM check, Construction of Honam High-speed Railway 3-1

    BIM’s information model of Railway made from existing 2D based drawings. Also, 3D model objects were linked with processes linkage. The rev...
    Period NationKorea ClientDongbu E&C Project3D BIM check, Construction of Honam High-speed Railway 3-1 Field Stage Work Scope
    Read More
Board Pagination ‹ Prev 1 2 3 4 Next ›
/ 4

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 Cancel

Designed by sketchbooks.co.kr / sketchbook5 board skin

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5

Sketchbook5, 스케치북5